Please use this identifier to cite or link to this item: https://hdl.handle.net/11499/10638
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIlce, A.C.-
dc.contributor.authorÖzkaya, Kadir-
dc.date.accessioned2019-08-16T13:32:01Z-
dc.date.available2019-08-16T13:32:01Z-
dc.date.issued2018-
dc.identifier.issn2029-4913-
dc.identifier.urihttps://hdl.handle.net/11499/10638-
dc.identifier.urihttps://doi.org/10.3846/20294913.2017.1334242-
dc.description.abstractThis paper aims to introduce a quantitative method to builders for the most appropriate material selections based on multiple attributes and integrate decision group member opinions throughout bidding process. In this respect, a new model used together with the Analytic Hierarchy Process (AHP) and fuzzy Multi-Objective Optimization on the Basis of Ratio Analysis (MOORA), multi-criteria decision methods are proposed. In a real decision process, there are many uncertainties and ambiguities. In fact decision makers cannot always provide practical guidelines and especially precise judgments due to time limitations. The intelligent model proposed demonstrates that the AHP and fuzzy MOORA approach can not only be used easily to imitate the decision duration in the material selection but also the results obtained from this work provide contractors valuable insight into the material selection problem. At the same time, the quantitative analysis method based on the appropriately raised floor materials along the bidding process enables the builders to use their restricted resources more expeditiously and enhances considerably the possibility of winning agreement, as one of the most striking points deduced from the present study. In short, the model with AHP and fuzzy MOORA approaches can assist the builders to improve resolutions for the bidding. © 2018 The Author(s). Published by VGTU.en_US
dc.language.isoenen_US
dc.publisherVilnius Gediminas Technical Universityen_US
dc.relation.ispartofTechnological and Economic Development of Economyen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectAhpen_US
dc.subjectFuzzy mooraen_US
dc.subjectIntelligent selection systemen_US
dc.subjectMaterial selectionen_US
dc.subjectReduce workloaden_US
dc.subjectThe cost of purchasingen_US
dc.titleAn integrated intelligent system for construction industry: A case study of raised floor materialen_US
dc.typeArticleen_US
dc.identifier.volume24en_US
dc.identifier.issue5en_US
dc.identifier.startpage1866-
dc.identifier.startpage1866en_US
dc.identifier.endpage1884en_US
dc.identifier.doi10.3846/20294913.2017.1334242-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopus2-s2.0-85054699493en_US
dc.identifier.wosWOS:000451062900004en_US
dc.identifier.scopusqualityQ1-
dc.ownerPamukkale University-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.grantfulltextopen-
item.languageiso639-1en-
item.openairetypeArticle-
item.fulltextWith Fulltext-
item.cerifentitytypePublications-
crisitem.author.dept31.05. Design-
Appears in Collections:Denizli Teknik Bilimler Meslek Yüksekokulu Koleksiyonu
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Files in This Item:
File SizeFormat 
AN INTEGRATED.pdf294.48 kBAdobe PDFView/Open
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

15
checked on Dec 14, 2024

WEB OF SCIENCETM
Citations

14
checked on Dec 18, 2024

Page view(s)

36
checked on Aug 24, 2024

Download(s)

18
checked on Aug 24, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.