Please use this identifier to cite or link to this item: https://hdl.handle.net/11499/37322
Title: Wind farm location selection with interval grey numbers based I-GRA and grey EDAS methods
Other Titles: Aralıklı gri sayı tabanlı A-GİA ve gri EDAS yöntemleriyle rüzgar santrali yer seçimi
Authors: Supçiller, Aliye Ayça
Bayramoğlu, Sena
Keywords: Interval grey numbers
Multi-criteria decision making
Wind farm location selection
Electric utilities
Linguistics
Location
Wind power
Decision problems
Decision-making problem
Geographic structures
Interval grey number
Location selection
Multi-criteria decision making problems
Multiple criteria
Renewable energy source
Decision making
Publisher: Gazi Universitesi
Abstract: Wind energy is the leading renewable energy source. It is one of the multi-criteria decision-making problems to choose the most suitable wind energy location among a large number of places with various geographic structure and wind resources based on multiple criteria. In decision-making problems, the results of the decision-makers are sensitive because of their uncertainty. In this study, the problem of wind farm location selection is discussed by using SWARA, I-GRA and Grey EDAS methods in order to eliminate the uncertainty in energy decision problems by using interval grey numbers. The SWARA method was used to compute the weight of the criteria which were determined by the reviews of experts and the literature. The criteria were evaluated by four decision makers. I-GRA and Grey EDAS methods based on interval grey numbers were used to rank the alternatives using the criteria weights and the location ranking was determined. Interval grey numbers were used to represent the decision makers' decisions in linguistic terms. As a result of the applications, "Çesme" was chosen as the most suitable location for a wind farm. The results of the study were reported to the decision makers and the study was approved by them. It is concluded that both methods integrated with interval grey numbers, which were used for the first time in wind farm location selection problems, are easy and applicable. © 2020 Gazi Universitesi Muhendislik-Mimarlik. All rights reserved.
URI: https://hdl.handle.net/11499/37322
https://doi.org/10.17341/gazimmfd.609518
ISSN: 1300-1884
Appears in Collections:Mühendislik Fakültesi Koleksiyonu
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
TR Dizin İndeksli Yayınlar Koleksiyonu / TR Dizin Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Files in This Item:
File SizeFormat 
82738012-98bb-423b-879d-dab344b5c147.pdf639.55 kBAdobe PDFView/Open
Show full item record



CORE Recommender

SCOPUSTM   
Citations

15
checked on Dec 14, 2024

WEB OF SCIENCETM
Citations

13
checked on Dec 18, 2024

Page view(s)

136
checked on Aug 24, 2024

Download(s)

48
checked on Aug 24, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.