Please use this identifier to cite or link to this item:
https://hdl.handle.net/11499/5703
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Cebesoy, T. | - |
dc.date.accessioned | 2019-08-16T11:52:35Z | - |
dc.date.available | 2019-08-16T11:52:35Z | - |
dc.date.issued | 1997 | - |
dc.identifier.issn | 1389-5265 | - |
dc.identifier.uri | https://hdl.handle.net/11499/5703 | - |
dc.identifier.uri | https://doi.org/10.1080/09208119708944060 | - |
dc.description.abstract | As the international surface mining industry proceeds into twenty first century, surface operation throughout the world will increasingly encounter many problems in terms of economic viability and in such situations, true cost analysis techniques taking into account time value of money approach have gained more important than ever before. Linear break even model as a true cost analysis model contributes an important role in surface mining equipment cost analysis. As an illustration, this paper introduces a linear break even model developed for equipment replacement analysis and in so doing, also the adaptation of two linear models which will be used in estimating equipment operating cost over time are examined in detail. Hence the paper is concluded with a given numerical example. | en_US |
dc.language.iso | en | en_US |
dc.publisher | shers | en_US |
dc.relation.ispartof | International Journal of Surface Mining, Reclamation and Environment | en_US |
dc.relation.ispartof | Uluslararası Hakemli Dergi | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Cost accounting | en_US |
dc.subject | Industrial economics | en_US |
dc.subject | Mathematical models | en_US |
dc.subject | Mining equipment | en_US |
dc.subject | Equipment replacement analysis | en_US |
dc.subject | Linear break even model | en_US |
dc.subject | Surface mining equipment cost analysis | en_US |
dc.subject | Open pit mining | en_US |
dc.subject | cost analysis | en_US |
dc.subject | mining equipment | en_US |
dc.subject | open pit mine | en_US |
dc.title | Surface mining equipment cost analysis with a developed linear break even model | en_US |
dc.type | Article | en_US |
dc.identifier.volume | 11 | en_US |
dc.identifier.issue | 2 | en_US |
dc.identifier.startpage | 53 | |
dc.identifier.startpage | 53 | en_US |
dc.identifier.endpage | 58 | en_US |
dc.identifier.doi | 10.1080/09208119708944060 | - |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopus | 2-s2.0-0030656287 | en_US |
dc.owner | Pamukkale_University | - |
item.grantfulltext | none | - |
item.openairetype | Article | - |
item.languageiso639-1 | en | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.cerifentitytype | Publications | - |
item.fulltext | No Fulltext | - |
Appears in Collections: | Mühendislik Fakültesi Koleksiyonu Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
CORE Recommender
SCOPUSTM
Citations
12
checked on Apr 26, 2025
Page view(s)
116
checked on Apr 14, 2025
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.