Please use this identifier to cite or link to this item:
https://hdl.handle.net/11499/7482
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Gören, Hacer Güner | - |
dc.date.accessioned | 2019-08-16T12:29:42Z | - |
dc.date.available | 2019-08-16T12:29:42Z | - |
dc.date.issued | 2014 | - |
dc.identifier.uri | https://hdl.handle.net/11499/7482 | - |
dc.description.abstract | This paper focuses on the capacitated lot sizing problem with two extensions namely setup carryover and setup splitting. The capacitated lot sizing problem finds the production quantities and periods of the products on a single machine. The problem is extended with the concepts of setup carryover and splitting in order to use the capacity more efficiently. The setup carryover is defined as the production of a product that is continued over from one period to the following without incurring extra setup costs or times. When the setups are relatively long and can not be finished in a period, the option of setup splitting permits to finish it in the consecutive period. Although there have been number of studies considering setup carryover in lot sizing literature, setup splitting is generally disregarded. However, these two concepts complement each other and should be taken into account together. The aim of this paper is to show the importance of the setup splitting in the capacitated lot sizing models on some preliminary experiments. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Computers and Industrial Engineering | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Capacitated lot sizing | en_US |
dc.subject | Lot sizing | en_US |
dc.subject | Setup carryover | en_US |
dc.subject | Setup splitting | en_US |
dc.subject | Manufacture | en_US |
dc.subject | Scheduling algorithms | en_US |
dc.subject | Capacitated lot sizing problem | en_US |
dc.subject | Production quantity | en_US |
dc.subject | Setup carryovers | en_US |
dc.subject | Setup costs | en_US |
dc.subject | Single- machines | en_US |
dc.subject | Production control | en_US |
dc.title | The capacitated lot sizing problem with setup carryover and splitting | en_US |
dc.type | Conference Object | en_US |
dc.identifier.startpage | 2441 | - |
dc.identifier.startpage | 2441 | en_US |
dc.identifier.endpage | 2451 | en_US |
dc.authorid | 0000-0003-0297-7571 | - |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopus | 2-s2.0-84923870107 | en_US |
dc.owner | Pamukkale University | - |
item.openairetype | Conference Object | - |
item.languageiso639-1 | en | - |
item.cerifentitytype | Publications | - |
item.grantfulltext | none | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.fulltext | No Fulltext | - |
crisitem.author.dept | 10.09. Industrial Engineering | - |
Appears in Collections: | Mühendislik Fakültesi Koleksiyonu Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
CORE Recommender
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.